GL1800Riders Forums banner

1 - 1 of 1 Posts

·
Registered
Joined
·
9,200 Posts
Discussion Starter #1
Enjoy US-60 between Superior and Miami - while you can...

https://azdot.gov/projects/southeast/us-60-pinto-creek-bridge-replacement-project/overview

The Arizona Department of Transportation (ADOT) and the Federal Highway Administration (FHWA) will replace the Pinto Creek Bridge, located on US 60 about 6 miles west of Miami, Arizona, starting in fall 2019.

Work is tentatively set to start in September 2019, and the project is expected to take about two years.

The project involves constructing a new bridge adjacent to the existing bridge, and then removing the existing bridge.
 
1 - 1 of 1 Posts
Top